Case Study : Millennium Train (4GT)

Client
DownerEDI Rail
Value
$25,000,000
Location
Newcastle, NSW, Australia
Completion
2005
Millennium Train (4GT) – Stage 1 and 2

RPC Technologies delivered complete a manufacturing solution for the millennium rail car which included the following.

  • Vacuum infused, ballistic rated drivers cab modules fully assembled, painted and electrically wired
  • Fire retardant interior linings (circa 21,000 pieces in total)
  • Exterior composite panels
  • Main salon lighting modules integrated with the air conditioning duct work and delivered entirely assembled
  • Light weight composite flooring

 

Further Documentation:

Download Case Study PDF

Images of this product:

Products Used in this Case Study

The following RPC Technologies products have been used in this Project:

Need more information?

Contact Us for access to our online client area.

Transport News

Transport Contact

RPC Transport 
56 Clyde Street
Broadmeadow NSW 2292
Australia

P: +61 2 4911 5500
F: +61 2 4911 5581

E: transport@rpctechnologies.com