Third Pipe Shipment Arrives for Haughton Pipeline – 1/3/2019

Third Pipe Shipment Arrives for Haughton Pipeline – 1/3/2019

The third lot of 6,500m of 1.8 metre diameter Flowtite® GRP pipes has arrived in Townsville from our RPC Pipe Systems plant in Lonsdale SA. This shipment and delivery to Iplex Pipelines staging storage site represents approximately the halfway point for delivered piping. Great work by the RPC PS team.

 



Marker Test

This is the body text for the issues being experienced at this location