Shaft module installed in a single liftCentral Interceptor, May Road
67t
Dome cover assembled on siteBelmont Desalination Plant
15m
Site services contract awarded at BHP Olympic Dam
2015

Installation

Installed by the team that built it

At May Road, Central Interceptor, the last five GRP segments were assembled above ground on-site to create a module 15.5m high. This 67-tonne module was installed in a single lift, completing the 7.5m diameter by 70m deep GRP cascade structure.

At Belmont, our Site team completed the site assembly of the 15m GRP dome cover; at St Marys WRRF, RPC installed and commissioned the complete odour control facility.

Looking down the Tawariki shaft during installation

Site services

Site services and maintenance

RPC was awarded a site services and maintenance contract at BHP Olympic Dam in 2015.

In South East Asia, our engineers in Indonesia and Singapore provide site supervision, installation and on-site training, and in Malaysia we have trained and qualified installation sub-contractors for GRP pipe installation works.