| 2025–26 | Alkimos SDP Stage 1 risers and pre-spoolingWater | ASWA / Water Corporation | Infrastructure | Three GRP risers + ~1,100 GRP spools | Perth WA, Australia |
|---|
| 2026 | Barwon Water panelWater | Barwon Water | Asset Services | FRP condition assessment panel | Geelong VIC, Australia |
|---|
| 2025–26 | Belmont Desalination intake coverWater | John Holland; Hunter Water | Infrastructure | 15m GRP dome cover, 20m below sea level | Belmont NSW, Australia |
|---|
| 2026 | Heavy Duty MVDMining | Mining customer (unnamed) | Products | New 2.4m HDMVD product | Broadmeadow NSW, Australia |
|---|
| 2026 | NGT tramsTram | Alstom; Vic Dept of Transport | Transport | Front end and roof hood assembly | Corio VIC, Australia |
|---|
| 2026 | Sydney Water FRP tank NDT; OCF maintenanceWater | Sydney Water | Asset Services | 68 tanks across 19 WRRFs; Odour Control Facility optimisation | Sydney NSW, Australia |
|---|
| ongoing | Water Corporation WAWater | Water Corporation | Asset Services | FRP condition assessments | WA, Australia |
|---|
| 2020–25 | Central InterceptorWastewater | Watercare; GAJV | Infrastructure | Nine GRP cascade shafts, 3m–7.5m diameter | Auckland, New Zealand |
|---|
| 2024–25 | KCT soy sauce factoryFood / industrial | Kwong Cheong Thye | Infrastructure | 53 FRP tanks (47 round 2.5–3m dia × 6.5–17.5m high + 6 rectangular) | Singapore (made in Batam), Singapore |
|---|
| 2023–25 | VLocity nose conesRail | Alstom; V/Line | Transport | 46 GRP nose cones to ballistic standard BR566 Type 2 | Corio VIC, Australia |
|---|
| 2024 | Keppel Sakra Cogen (600MW, hydrogen-ready)Energy | Keppel | Infrastructure | GRP seawater cooling pipe up to 2.8m diameter | Jurong Island, Singapore |
|---|
| 2022–24 | Maribyrnong Main Sewer UpgradeWastewater | Melbourne Water; SFPJV | Infrastructure | 4m × 38m GRP maintenance shaft (Batam + Corio) | Melbourne VIC, Australia |
|---|
| 2024 | Sembcorp CCP4 (600MW) — Phase 2Energy | Jurong Engineering Ltd (JEL) | Infrastructure | Main CW pipe up to 2.4m diameter + auxiliary CW (RPC also supplied Phase 1 CCP3, 2014) | Jurong Island, Singapore |
|---|
| 2019–24 | St Marys WRRF odour control facilityWastewater | Sydney Water / AdaptJV | Infrastructure | Complete odour control facility | Sydney NSW, Australia |
|---|
| 2023 | G Class tram mock-upTram | Alstom | Transport | Fully-operable mock-up | Broadmeadow NSW, Australia |
|---|
| 2023 | PT Amman Batu Hijau CCPP-1 (450MW)Energy | JEL / PT JEL; PT Amman Mineral | Infrastructure | ~900m PN6 GRP pipe DN50–DN1100, fittings, supports; full engineering package | Sumbawa, Indonesia |
|---|
| 2023 | Ship hull tank test modelsMarine | Solution Engineering (Malaysia) | Products | 1:100 VLCC and 1:70 FPSO GRP hulls | Batam, Indonesia |
|---|
| 2022–23 | X'Trapolis 2.0 mock-upRail | Alstom; Vic DTP | Transport | Full-scale motor + trailer car mock-up | Broadmeadow NSW, Australia |
|---|
| 2021 | Hsinta Power Station extension (Units 1–3)Energy | GE | Infrastructure | Cooling water piping (designed Sydney, made Batam, project managed from Singapore) | Taiwan |
|---|
| 2021 | Perth Metronet DMU (Australind replacement)Rail | Alstom; WA PTA | Transport | Sanitary toilet modules incl. tanks, kits and final assembly | Perth WA, Australia |
|---|
| 2020 | Coombabah STP Stage 6Wastewater | Acciona; AZZURO | Infrastructure | Odour control: 3 bio-trickling filters, 800m duct, 600 m² covers | Gold Coast QLD, Australia |
|---|
| 2020 | Lower Molonglo WWTPWastewater | Icon Water | Infrastructure | 20m self-supporting, perimeter-bolted GRP tank cover lifted in one piece | ACT, Australia |
|---|
| pre-2020 | Amaroo Sewer Main; Carlton Sewer Upgrade; Princes St manholeWastewater | Yarra Valley Water; Melbourne Water; JHG | Infrastructure | GRP manholes and shafts | Melbourne VIC, Australia |
|---|
| 2019 | Epping Main Sewer UpgradeWastewater | Yarra Valley Water; JHG | Infrastructure | 2 × DN3200 + 2 × DN4000 PermaManhole liners, 38–40m deep | Melbourne VIC, Australia |
|---|
| 2018–19 | Haughton Pipeline DuplicationWater | Townsville City Council; Iplex | Infrastructure | Fittings made at a new Townsville facility | Townsville QLD, Australia |
|---|
| 2019 | Tambak Lorok CCPP Block 3Energy | Indonesia Power | Infrastructure | 2.4m GRP cooling water pipe, hydrostatic testing | Semarang, Indonesia |
|---|
| 2017–18 | HawkeiDefence (Land) | Thales Australia | Defence | Fully functional dashboard assemblies (Land 121 Phase 4) | Corio VIC, Australia |
|---|
| 2018 | Hunter Class frigates (SEA5000)Defence (Sea) | BAE Systems; Tods Defence UK | Defence | Partnership to deliver sonar domes and composite items | —, Australia |
|---|
| 2014–18 | Riviera motor yachtsMarine | Riviera Australia | Products | CNC patterns, moulds and first-off parts | Batam, Indonesia |
|---|
| 2017 | Batang coal-fired power stationsEnergy | — | Infrastructure | 3.9m × 12.75m GRP cooling water pipes, 12km of pipe and fittings (~1,000 pipes) | Central Java, Indonesia |
|---|
| 2017 | Bulimba Creek Sewer Upgrade Stage 2Wastewater | QUU; Abergeldie–Obayashi JV | Infrastructure | PermaManholes (jacking pipe by RPC Pipe Systems, since divested) | Brisbane QLD, Australia |
|---|
| 2003 / 2017 | Collins Class submarinesDefence (Sea) | Australian Defence | Defence | Acoustic windows at commissioning; re-engineered DA acoustic window sets for LOTE | Broadmeadow NSW, Australia |
|---|
| 2017 | Land 121 Phase MH3BDefence (Land) | Rheinmetall MAN (RMMVA); Mecprotec Oy | Defence | Prototype of new handling equipment under exclusive licence | —, Australia |
|---|
| 2015– | BHP Olympic DamMining | BHP | Infrastructure | Site services and maintenance contract | Roxby Downs SA, Australia |
|---|
| 2011–12 | Sea Urchin SU550 tidal turbineRenewables | — | Infrastructure | Composite structures; 3 Engineering Excellence Awards (Newcastle) | NSW, Australia |
|---|
| 1998 | BHP Whyalla AirfinesMining / industrial | BHP; Voest Alpine Industries (VAI) | Infrastructure | 2 × wet gas scrubbers 8.2m × 26m; exhaust stack 3.8m × 100m — the largest GRP structures ever manufactured in Australia | Whyalla SA, Australia |
|---|
| — | Hobsons Bay Sewer UpgradeWastewater | Melbourne Water | Infrastructure | Vortex structure / shafts | Melbourne VIC, Australia |
|---|
| — | India RRTS/MTRS, Sydney Metro, Montreal REM front endsRail | Alstom | Transport | Composite front ends | India |
|---|
| — | Subiaco WWTPWastewater | John Holland | Infrastructure | Covers and duct | Perth WA, Australia |
|---|